Oxford
Bathroom refurbishment with walk-in shower and whirlpool bath, Oxford
Strip-out to finish, with a marble floor, walk-in shower, screen and tray, and a whirlpool bath in grey tile.


From bare walls to a walk-in shower. This case study follows the job in order: the strip-out, the tile preparation, fitting the shower screen and tray, then the finished walk-in shower and whirlpool bath.
What we did
Work included strip-out and disposal, plumbing first fix, waterproofing and floor build-up, the shower screen and tray, marble floor and grey wall tiling, sanitaryware and decoration.
Contact
Planning something similar?
Tell us about the job and we will come and look.
Send Harry a photo of the job
- Step 1

Take a photo or two of the job. A wide shot of the room or wall helps, plus a close-up of anything damaged.Like this one, a dormer before we repaired it.
- Step 2
Send it on WhatsApp to 07719 619850, with your postcode and a line about what you would like done.
- Step 3
Harry gets back to you to arrange a visit. After the visit you get a written quote.
Same number as the phone.
Monday to Saturday, 08:00 to 17:00




